kevinludlow.com Home Photo Albums Contact Kevin Ludlow Kevin Ludlow's Resume
Kevin Ludlow

Mueller Phase I Nearing Completion
Austin, TX

I wanted to stop by and see how some of the progress on Dreux and Amy's upcoming new house was. As I suspected, everything was coming along smoothly.

I also took a few minutes to explore the David Weekley 'Willie' house that I had initially had a contract to purchase.

Mueller Phase I Nearing Completion
Photo 3 of 35 | Back to Album | Back to Photos | Download Original
« previous   next »
Turk Caption(s): [What is this]
This looks like a kitchen being remodeled. It has a center island, made with wood siding. There is a window to the left of the picture. The counter tops surround the island about two feet away from the center island and on the left side of the picture in front of the center island. The walls are made out of tile, peach colored. There are about eight cabinets above the counter tops and two cabinets directly on top of the counter, close to the window. The counter tops and center island is covered with a drop cloth, taped to the tops.
From the album(s): "Mueller Phase I Nearing Completion"
Make Canon
Aperture Value F2.8
Exposure Program 1/60 s
Focal Length 5.8 mm
Metering Mode Matrix
Date/Time 2008-03-05 16:59:28
Model Canon PowerShot SD850 IS
Exposure Bias 0
Flash No, compulsory
ISO 125
Shutter Speed 1/60 s
Original Size 3264x2448
Kevin Ludlow
resume about terms privacy